Leveling chamber and related parts (4-cylinder engines)
1. Recirculation tube; 2. Leveling chamber; 3, 13. Gasket; 4. Petrol pipeline; 5. Comb; 6. Sealant; 7, 17. Ring; 8. Nozzle; 9. Insulator; 10. Collector; 11. Rack; 12. Return petrol pipeline; 14. Converter; 15. Front exhaust pipe; 16. Hook; 18. Pipe oil indicator; 19. Outlet pipe; 20. Heat shield; 21. Exhaust manifold; 22. Ground connection bus; 23. Wiring bracket; 24. Back cover
Leveling chamber and related parts (3.4L V6 engines)
1. Flow sensor, resonator and air filter; 2. Flowmeter connector; 3. Leveling chamber; 4. Tank hose with absorber; 5. Recirculation tube; 6. Gasket; 7. Brake booster hose; 8. Petrol pipeline; 9. Rack; 10. Ring; 11. For vehicles with automatic transmission; 12. Pipe for liquid filling; 13. Throttle cable clamp; 14. Tourniquet; 15. Suction manifold; 16. Air hose; 17. Power steering hose
Removing
1. Disconnect the battery from the ground.
2. Disconnect the connectors from the recirculation valve, idle air control, throttle sensor and absorber reservoir valve.
3. Disconnect the thrust and cables from the damper housing.
4. Disconnect the recirculation tube from the valve.
5. Label and disconnect all vacuum hoses.
6. Disconnect the crankcase ventilation hose from the chamber.
7. Remove the bus connecting to the ground.
8. Disconnect and plug the cooling hoses from the throttle body.
9. Turn away bolts and remove the chamber in gathering with the shutter case.
10. Clean the split planes, install a new gasket and leveling chamber. Further assembly is carried out in the reverse order.